Theometrics Architectural NavigationTheometrics Architectural Navigation
      Theometrics Architectural Navigation

Theometrics News

April 6, 2009 | Theometrics Wins FIATECH Ceti Award

Theometrics Wins FIATECH Ceti Award

March 31, 2010 – NEW YORK, NY – Theometrics, an electronic measurement and layout technology that bridges the gap between Building Information Modeling (BIM) and the field while integrating sustainable design concepts with those of sustainable construction, has received the 2009 FIATECH Celebration of Engineering and Technology Innovation (CETI) Award in the category of Real-Time Project and Facility Management, Coordination and Control.

FIATECH recognized and honored nine organizations and individuals for their extraordinary work in developing and deploying innovative engineering and construction technologies. Other recognized companies include The Lower Manhattan Construction Command Center, Gehry Technologies, Target Corporation, DPR Construction, Cianbro, Barton Malow, Blach Construction, Mani Golparvar-Fard and Vineet R. Kamat, Ph.D.

The award highlighted Theometrics’ capabilities as an innovator in dimensional quality control and risk mitigation services with regard to the New York State / David H. Koch Theater project. Theometrics was contracted by RCDolner Construction to supply dimensional quality control and risk mitigation services for the New York State / David H. Koch Theater project.

About TheometricsTheometrics ServicesTheometrics BenefitsTheometrics Benefits
About TheometricsTheometrics Case StudiesTheometrics BenefitsContact Theometrics

Theometrics conducted electronic as‐built measurement of existing conditions and created dimensionally accurate CAD drawings in .dwg format in the field, performed deviation studies that compared existing conditions to proposed design or shop drawings and also performed automated construction layout directly from the digital construction drawings.

RCDolner’s successful renovation was completed in the fall of 2009. The David H. Koch Theater originally opened in 1964 and was designed by architect Phillip Johnson. By 2008 the theater-home to the New York City Ballet and the New York City Opera was in need of extensive renovation, which included upgrades to the infrastructure, lighting and mechanical system.

New installations included a state-of-the-art orchestra lift, fire curtain and stage-rigging system. With the replacements to the theater seating, flooring, wall covering, carpeting and restrooms, the theater received a long overdue new look. Working closely with its clients, RCDolner ensured a successful project maximizing the satisfaction for both the performers and audience alike.

“The construction industry is changing,” says Theometrics President and Founder, Sam Stathis, “and industry employees need to be comfortable exploring the revolutionary means and methods to support that change. The ability to deploy digital measurement and layout practices or dimensional quality control means positive impact for the entire construction process at every level, and it is wonderful that Theometrics was recognized for an award that celebrates the future of the construction industry.”

Partner Links:

RC Dolner Construction Polo Electric

Download a Printable Version:

Made in USA
Theometrics Architectural Navigation
   
Request Information :Email Newsletter icon, E-mail Newsletter icon, Email List icon, E-mail List icon
Theometrics Architectural Navigation
  ©2010 Theometrics, LLC. 497 Canal Street, NY, NY 10013   t:(973) 219-9760   f:(212) 691-9605   e: info@theometrics.com
Member: USGBC , Building Smart Alliance , BIM Forum , Metro BIM Forum Meetup Group , NECA , FIATECH 
The Stathis Enterprises network: Polo Electric | Theometrics | Celebrity Farms | Celebrity Vision  
Theometrics is a leading Autodesk Development Partner
Share |
 
 
  home | about | services | benefits | news | case studies | construction & industry links | site map | certified service providers | contact